A Fault-tolerant Task Scheduling Algorithm Supporting the Minimum Schedule Length
Vol. 7, No. 4, pp. 1201-1210, Apr. 2000
10.3745/KIPSTE.2000.7.4.1201
Abstract
Statistics
|
Cite this article
[IEEE Style]
B. J. Min, "A Fault-tolerant Task Scheduling Algorithm Supporting the Minimum Schedule Length," The Transactions of the Korea Information Processing Society (1994 ~ 2000), vol. 7, no. 4, pp. 1201-1210, 2000. DOI: 10.3745/KIPSTE.2000.7.4.1201.
[ACM Style]
Byoung Joon Min. 2000. A Fault-tolerant Task Scheduling Algorithm Supporting the Minimum Schedule Length. The Transactions of the Korea Information Processing Society (1994 ~ 2000), 7, 4, (2000), 1201-1210. DOI: 10.3745/KIPSTE.2000.7.4.1201.