Methodology of Analyze the Risk Using Method of Determinated Quantity 


Vol. 13,  No. 7, pp. 851-858, Dec.  2006
10.3745/KIPSTC.2006.13.7.851


PDF
  Abstract

The risk analysis's aim is analyze the risk for the asset of organization with asset assessment, vulnerability assessment, threat assessment. existing TTA risk analysis methodology model propose to overall flow, but can not propose to detail behavior of each level. That is, step of risk analysis is insufficient in classification of threat and detail proposal of considered the risk with classified threat. So this paper propose that analysis and evaluate the vulnerability and threat assessment with determinated quantity. this paper consider current national information system and threat of environment and technology. so can estimate the risk with determinated quantity. finally, analyze the asset risk of organization.

  Statistics


  Cite this article

[IEEE Style]

J. G. Park, "Methodology of Analyze the Risk Using Method of Determinated Quantity," The KIPS Transactions:PartC, vol. 13, no. 7, pp. 851-858, 2006. DOI: 10.3745/KIPSTC.2006.13.7.851.

[ACM Style]

Joong Gil Park. 2006. Methodology of Analyze the Risk Using Method of Determinated Quantity. The KIPS Transactions:PartC, 13, 7, (2006), 851-858. DOI: 10.3745/KIPSTC.2006.13.7.851.